Hillock Drive Project

The foundation and retaining wall system to support the new Hollywood Hills home.

Project description

The foundation and retaining wall system to support the new Hollywood Hills home and the hillside behind it required carving out and retaining a large notch in a near vertical up slope lot. Hundreds of tons of steel and hundreds of cubic yards of concrete were used to construct the 70’ deep piles and 30’ tall retaining walls.

Info

Project Credits:

  • Year: 2006
  • Role: General Contractor
  • Client: Michael Binikos